Service

Home - Service - CGMP Certification

Based on 2010 GMP requirement, providing needed data for certification
1. Clean construction certification

a) Alignment equipment

b) Installation confirmation

c) Operational confirmation

d) Functional confirmation

e) Air Handler functional confirmation

f) Anti-bio confirmation

g) Operational second confirmation

2. Packing confirmation

3. Tool list

4. Installation confirmation

5. Material confirmation (direct contacting to product)

6. Equipment confirmation

7. Lubricant confirmation (must be food standard)

8. Drawings and documents confirmation

9. Share utility confirmation

Home  |  About MIC-TECH  |  Service  |  Scope  |  Contact  |  Group

© All rights reserve copyright 2013 MIC-TECH Electronics Engineering Corp